Nairobi Bottlers – PM Planner (Embakasi).

Get a free C.V. review by sending your C.V. to submitcv@careerassociated.com or click the following link. Submit C.V.! use the subject heading REVIEW.

IMPORTANT: Read the application instructions keenly, Never pay for a job interview or application.

Click the Links Below to Get Job Updates.

https://www.facebook.com/groups/1126060830815705

https://t.me/joinchat/EBWPu0Cfzh880lRySce_AQ.


Company Overview

Coca-Cola Beverages Africa is the largest African Coca-Cola bottler, accounting for 40% of all Coca-Cola volumes on the continent. CCBA is a market leader in the NARTD non-alcoholic ready to drink market in Africa. CCBA has an extensive footprint in Africa, employing approximately 16 000 employees in Africa, and approximately 7 000 employees in South Africa.

Key Purpose Statement

To manage the relevant maintenance systems, generate routine and planned maintenance schedules, support the maintenance team in the execution of maintenance and facilitate problem solving so that line availability and efficiency is maximized, breakdowns are minimized and manufacturing costs are kept to a minimum.

Key Duties & Responsibilities

1. Maintenance Planning and Control

• Plan the maintenance day following the 5 day planning cycle as per figure 1 Planning cycle.
• Review emergency works orders using the standard and create sub-works orders.
• Create the maintenance plan and assign tasks to team members, including contractors.
• Communicate and distribute plan to team members.
• Update the maintenance plan directly after the forward planning meeting.
• Organize and distribute maintenance work orders with loading sheet to Team Leaders.
• Ensures that required tools and spares are available.
• Plan the execution of the autonomous maintenance and running schedules for the unit.
• Chair Pre, Post maintenance meetings and issue minutes.
• Update task lists if required.
• Create spares reservations.
• Review safety requirements of tasks in planning table where needed.
• Identify, prioritize and agree PJO’s to be completed.


2. Continuous Improvement

• Ensure that situation and systemic problem solving is initiated to ensure loop closure.
• Populate the daily downtime and 5 Why Board, indicating the status of 5 Why completion and the quality of 5 Why’s received.
• Raises corrective maintenance work to be done on maintenance day.
• Plan effective weekly maintenance shut down.
• Plan effective annual maintenance shut down.
• Conduct spot checks on short interval controls preform and syrup tracker, hourly efficiency, line V-Profile speeds as part of daily walk about.
• Ensure line speeds are set according to V-Profile and that machines are run at rated speeds.
• Analyse SAP downtime data.
• Ensure all asset care work complies with asset care standards.


3. Implement Engineering Change Management

• Initiate Engineering changes control on SAP and ensure that a responsible person is assigned to execute the change.
• Verify that the Engineering changes have been executed successfully and documented.
• Ensure that the required engineering change control documents have been updated and that the change request is closed.

4. Maintenance Programme Development

• Ensure effective safety awareness talks, incident recalls, tool box talks.
• Provide PPE and ensure compliance budget availability.
• Ensure compliance to permit to work where required with audit compliance.
• Report incidents level 3 leadership.
• Incident investigations to be closed in 24 hours.
• Ensure identified safety hazards on line are managed to closure including people behaviours.
• Attend and report into SHE Meeting.
• Facilitate the teams risk management processes.

5. Breakdown Management

• Verify content correct.
• Recon to stoppage info.
• Follow on work agreed.
• CM tasks raised.
• Close breakdown order.

6. Manage the Maintenance Spares

• Investigate and plan for upcoming promotions, new products, trials.
• Train team members on new processes, procedures, technologies and ensure competence.
• Identify productivity opportunities people, cost, CAPIN.
• Communicate benchmark shared learnings to team.
• Facilitate the development and use of machine problem solving systems.
• Ensure problem solving taking place and loop closure taking QFR, 5why, FFA, End state analysis, system analysis stage.

Qualifications
•Diploma in Engineering Mechanical or Electrical


Experience

• 3 to 5 years production engineering experience with 3 years in supervisory level
• Knowledge of Packaging plant will be an advantage
• PC literate SAP , Proficiency in Microsoft office applications

APPLY

Closing Date: 2021/02/21

.

.

.

Coca Cola Beverages Africa in Kenya

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Create a website or blog at WordPress.com

Up ↑

%d bloggers like this: